Feasibility study of the Construction and Operation of the New Sports Dock of the Motril Harbour

The study was based on the Port Space Utilisation Plan, approved in 1999, which established the limits of the port and the uses of the service area in the land and water areas. The following plans show the different elements that would be incorporated into the new dock, such as the excavation of the elevations, the excavation and construction of the diaphragm wall, the construction of the mooring pontoons for the nautical-sports fleet and the cruise ship/rail dock, the dissipative dock, the breakwater of the new dock and the alignment of the new section of the dock.